 |
 |
 |
| Mátrai Erőmű Zrt. - new road construction (South part) - 2010 |
 |
 |
 |
M3 motorway - road renewal - 2009 96+455 - 99+020km |
 |
 |
 |
| M3 highway - right side orbit casing renovation - 2007(78+675 - 87+000km) |
 |
 |
 |
| 3 No highroad - the building of an overtaking lane (152+830 - 153+630km) |
24177 No road (Parádsasvár, Kossuth street) road a crossing section's renovation |
22 No highroad - the casing affirmation of a road |
 |
 |
 |
| Detk: the building of cycle track with wooden bridge |
Apc: the building of the roundabout |
 |
 |
 |
| Abasár: the building of the 32 room retirement homes |
Gyöngyös: the building of the car showroom and a service with a floor-space of 750m2 |
 |
 |
 |
| Gyöngyös: the building of a logistic centre with a floor-space of 3500m2 |
 |
 |
 |
| Fót: the building of the roundabout |
M3 highway - the renovation of the lay-by beside the road in Jakabpuszta |
Jászfényszaru: the building of the roundabout |